top of page
Image by Clyde Thomas

PROJECTS

Latest 12-Months Track Record

Feel free to contact us for your geosolution needs!

IMG-20231101-WA0027.jpg

SUBSEA FIBRE-OPTIC CABLE REPAIR (~140KM RANGE)

Oct 2023 - Geoconsultancy

  • Consultancy includes advisory and supply of geoconsultants and partial systems to ensure reliability of client's offshore operations for an private fibre-optic cable owner.

  • Mobilization planning and delivery of TPE analysis (i.e. error budget) of positioning systems to ensure client ROVs can be navigated to exact location of repair.

  • Project completed with Zero downtime

WhatsApp Image 2024-01-03 at 21.28.50_c0d280ea.jpg

SUBSEA ASSET INSTALLATION AT HIGHLY CONGESTED AREA (~100M WATER DEPTH)

Jan 2024 - Geoconsultancy

  • Geoconsultancy service to complete a partially installed subsea asset for a national oil company

  • Delivered end-to-end execution plan including geomatics consultancy for approach plan for vessel to platform (~50m clearance)

  • Embedded remote operations to allow client onshore team to monitor execution and quality.

  • Preparation of relevant reports meeting SSDM requirements  

ROVR logo.png

PAN MALAYSIA IRM (SABAH) 5 YEAR EXCLUSIVE CONTRACT

2024-2029 - Geosolutions

  • Exclusive Geosolutions service provider covering Geoconsultancy, Geomatics and Geophysical services for ROV Resources (M) Sdn. Bhd. 

  • Scope of Inspection, Repair and Maintenance for 6 operators within Sabah waters including WROV, Saturation Dive and Air-Dive

20231025_151639.jpg

OFFSHORE POST LAY BURIAL / TRENCHING (~40-60M WATER DEPTH)

Feb 2023 - Geoconsultancy

  • Geoconsultancy service to integrate underwater positioning, depth identification (sonar) to the client's new method of mass-flow-excavator

  • Planning and the execution of positioning systems required to ensure absolute position and trench depth is recorded. 

  • Delivery of integrated report ensuring all survey data from installation to burial depth is aligned.

20240507_125110_edited.jpg

FLEXIBLE FLOWLINE INSTALLTION (INCLD PRE AND POST SURVEY)

May 2024

  • PL314 (Sabah) end-to-end Geosolutions including Geomatics & Geoinformation services

  • Bespoke solution for <10m WD to accurately map and position flexible flowline and mattresses utilizing WROV and Air-Divers

  • Completed project successfully within error budgets and tolerance.

  • Project was in collaboration with our trusted partners ensuring system reliability

WhatsApp Image 2024-08-14 at 13.24.41_65ce0465.jpg

FLEXIBLE FLOWLINE AS-BUILD AND MATTRESS INSTALLATION

July 2024

  • PL431 (Sarawak) end-to-end Geosolutions including Geomatics & Geoinformation services

  • Bespoke solution for ~30m WD to accurately map previously installed and buried flexible flowline to accurately position concrete mattresses utilizing WROV and Air-Divers

  • Completed project successfully within error budgets and tolerance.

  • Project was in collaboration with our trusted partners ensuring system reliability

MBES sample_edited.jpg

GEOPHYSICAL MULTIBEAM SURVEY

Sept 2024 - Geophysical

  • Geoconsultancy scope on which delineated and reduced systems while meeting Clients' objective. 

  • Fit for purpose multibeam echo sounder proposed and delivered to identify key features of interest efficienty post ROV operations.

  • Calibration, data QC and processing done fully remotely onshore with live operations streamed.

  • Achieved all objectives of Client within timeframe and zero downtime.

USV image.jpg

USV REPAIR & MAINTENANCE

Sept 2024 - Geoconsultancy

  • Awarded a federal governement contract to consult, inspect, maintain and repair their fully autonomous offshore survey grade Unmanned Surface Vessel (USV)

BMS_edited.jpg

BARGE & TUG POSITIONING SERVICES

2024-2029 - Geosolutions

  • Geomatics services for a EPCIC client

  • Multi-month barge & tug positioning services to support repair and replacement work for a subsea asset

bottom of page